HALIBUT POINT ROAD over CASCADE CREEK

MILE POINT 2.0 · County 220, Alaska · Built 1937 · 2 Lanes · 4,790 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
0867
Year Built
1937
Reconstructed
1972
Length
16.5 m (54.1 ft)
Max Span
15.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,790
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.