HALIBUT POINT ROAD over NO NAME CREEK

MILE POINT 6.6 · County 220, Alaska · Built 2014 · 2 Lanes · 1,360 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0327
Year Built
2014
Length
38.1 m (125 ft)
Max Span
36.9 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
1,360
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.