MARINE HWY ROUTE over HAINES FERRY TERMINAL

HAINES · County 100, Alaska · Built 1984 · 1 Lanes · 43 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

59.278544, -135.435453

This bridge is in worse condition than 65% of bridges in County 100. The average bridge in Alaska is 0 years old; this one is 42 years old.

Nearby Bridges

Bridge Details

Structure #
0804
Year Built
1984
Length
51.2 m (168 ft)
Max Span
42.7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
43
Material
Steel
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.