LUTAK SPUR over CHILKOOT RIVER

MILE POINT 4.8 · County 100, Alaska · Built 1979 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

59.321892, -135.549583

This bridge is in worse condition than 65% of bridges in County 100. The average bridge in Alaska is 0 years old; this one is 47 years old.

Nearby Bridges

Bridge Details

Structure #
0387
Year Built
1979
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
90
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.