ALASKA HIGHWAY over TOK RIVER

MILE POINT 85.2 · County 240, Alaska · Built 2019 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 9 Excellent

Location

63.324522, -142.836883

This bridge is in worse condition than 9.4% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 7 years old.

Nearby Bridges

Bridge Details

Structure #
0506
Year Built
2019
Length
109.7 m (359.9 ft)
Max Span
36.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
400
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.