ALASKA HIGHWAY over TANANA RIVER
MILE POINT 79.1 · County 240, Alaska · Built 2010 · 2 Lanes · 250 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
63.312361, -142.648592
This bridge is in worse condition than 9.4% of bridges in County 240. The average bridge in Alaska is 0 years old; this one is 16 years old.
Nearby Bridges
Bridge Details
- Structure #
- 0505
- Year Built
- 2010
- Length
- 275.1 m (902.6 ft)
- Max Span
- 45.7 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.