CHENA HOT SPR RD over WEST FORK CHENA RIVER

MILE POINT 52.4 · County 090, Alaska · Built 1967 · 2 Lanes · 530 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

65.054478, -146.179117

This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
0239
Year Built
1967
Reconstructed
1976
Length
49.4 m (162.1 ft)
Max Span
24.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
530
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.