CHENA HOT SPR RD over NORTH FORK CHENA RIVER

MILE POINT 48.9 · County 090, Alaska · Built 1967 · 2 Lanes · 530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

65.012917, -146.220006

This bridge is in worse condition than 16.1% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
0237
Year Built
1967
Reconstructed
1976
Length
55.4 m (181.8 ft)
Max Span
18.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
530
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.