IRR BIA RTE 1001 over UNNAMED TIDAL RIVER
NEAR WATER RESEVIOR · County 050, Alaska · Built 2003 · 2 Lanes · 25 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
59.879783, -163.166181
This bridge is in worse condition than 61.5% of bridges in County 050. The average bridge in Alaska is 0 years old; this one is 23 years old.
Bridge Details
- Structure #
- 0000E02276T0800
- Year Built
- 2003
- Length
- 64.1 m (210.3 ft)
- Max Span
- 42.5 m
- Width
- 3 m (9.8 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.