IRR BIA RTE 1029 over SWAMPY POND
0.1KM SOUTH OF IRA OFFICE · County 122, Alaska · Built 2000 · 1 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
59.868131, -163.146828
This bridge is in worse condition than 42.2% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 26 years old.
Bridge Details
- Structure #
- 0000E02276T0780
- Year Built
- 2000
- Length
- 51.3 m (168.3 ft)
- Max Span
- 2.1 m
- Width
- 3.1 m (10.2 ft)
- Lanes
- 1
- Daily Traffic
- 200
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.