NEAL ROAD over TOFTOY THROUGHWAY

0.55 miles N of VBC49 · County 089, Alabama · Built 1968 · 3 Lanes · 1,992 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPAMCRED000017
Year Built
1968
Reconstructed
2007
Length
67.8 m (222.4 ft)
Max Span
21.4 m
Width
13 m (42.7 ft)
Lanes
3
Daily Traffic
1,992
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.