TOFTOY THRUWAY over MARTIN ROAD

REDSTONE ARSENAL · County 089, Alabama · Built 1968 · 3 Lanes · 6,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
DAPAMCRED000010
Year Built
1968
Reconstructed
2008
Length
61.3 m (201.1 ft)
Max Span
17.8 m
Width
13 m (42.7 ft)
Lanes
3
Daily Traffic
6,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.