PATTON ROAD over HUNTSVILLE SPRING BRANCH

REDSTONE ARSENAL · County 089, Alabama · Built 1996 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPAMCRED000006
Year Built
1996
Length
39.6 m (129.9 ft)
Max Span
38.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.