DUCKNEST SPRING-Br over SALT CREEK

TALLADEGA DISTRICT · County 029, Alabama · Built 1988 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
080106000003059
Year Built
1988
Length
7.3 m (24 ft)
Max Span
7 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Channel Beam
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.