SR 21 over DRY CREEK
2.5 MI S OF OXFORD · County 121, Alabama · Built 1942 · 2 Lanes · 6,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.565561, -85.861964
This bridge is in worse condition than 85.2% of bridges in County 121. The average bridge in Alabama is 0 years old; this one is 84 years old.
Nearby Bridges
SR 21 over DRY CREEK
Built 2004
CO. ROAD 128 over DRY BRCH TO CHOCCOLOCCO
Built 1935
CO. RD.044 COBB RD over SILVER RUN CREEK
Built 1912
CO. ROAD 135 over DRY BRCH TO CHOCCOLOCCO
Built 1955
SR 21 over CHOCCOLOCCO CREEK RELIEF
Built 2006
SR 21 over CHOCCOLOCCO CREEK RELIEF
Built 2005
MCINTOSH ROAD over DRY BRANCH
Built 1998
SR 21 over CHOCCOLOCCO CREEK
Built 2006
SR 21 over CHOCCOLOCCO CREEK
Built 2005
SR 21 over TUSKEHADKY BRANCH
Built 1942
Bridge Details
- Structure #
- 002685
- Year Built
- 1942
- Length
- 27.1 m (88.9 ft)
- Max Span
- 6.7 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 6,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $721,000
- Total Project Cost
- $793,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.