SR 21 over DRY CREEK

2.5 MI S OF OXFORD · County 121, Alabama · Built 1942 · 2 Lanes · 6,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
002685
Year Built
1942
Length
27.1 m (88.9 ft)
Max Span
6.7 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
6,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$721,000
Total Project Cost
$793,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.