Jack Warner PKWY over Stream

_1.3 mi east of US 82 · County 125, Alabama · Built 1985 · 4 Lanes · 20,550 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
021735
Year Built
1985
Length
27.1 m (88.9 ft)
Max Span
5.5 m
Width
78 m (255.9 ft)
Lanes
4
Daily Traffic
20,550
Material
Other
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,367,000
Total Project Cost
$5,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.