WOODBANK PARKWAY over Wright Branch

0.3 MI. W OF US 69 SOUTH · County 125, Alabama · Built 2022 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021724
Year Built
2022
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.