CR-31 over Walker Branch

0.2 MI W PL HILL CHURCH · County 115, Alabama · Built 2022 · 2 Lanes · 920 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021620
Year Built
2022
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
920
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$311,000
Total Project Cost
$342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.