ST CLAIR 31 over BIG CANOE CREEK

03 MI NW COOL SPRINGS CHU · County 115, Alabama · Built 1983 · 2 Lanes · 373 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
013001
Year Built
1983
Length
78 m (255.9 ft)
Max Span
15.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
373
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,692,000
Total Project Cost
$1,861,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.