I-65 over SEPULGA RIVER

_ · County 035, Alabama · Built 2024 · 2 Lanes · 30,356 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
021558
Year Built
2024
Length
126.2 m (414 ft)
Max Span
42.1 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
30,356
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,229,000
Total Project Cost
$3,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.