I-65 over SEPULGA RIVER REL

_ · County 035, Alabama · Built 2024 · 2 Lanes · 30,356 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

31.553258, -86.873067

This bridge is in worse condition than 32.1% of bridges in County 035. The average bridge in Alabama is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
021556
Year Built
2024
Length
103.6 m (339.9 ft)
Max Span
25.9 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
30,356
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,707,000
Total Project Cost
$2,978,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.