US90 SR10 over Perdido River

Florida & Alabama Line · County 003, Alabama · Built 2013 · 2 Lanes · 6,993 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021475
Year Built
2013
Length
226 m (741.5 ft)
Max Span
25.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
6,993
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.