US 90 over STYX RIVER RELIEF

0.5 MI W FLORIDA LINE · County 003, Alabama · Built 1949 · 2 Lanes · 5,381 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
003421
Year Built
1949
Length
176.2 m (578.1 ft)
Max Span
10.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,381
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,144,000
Total Project Cost
$4,558,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.