_Shalerock Drive over _

_ · County 083, Alabama · Built 2018 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
021421
Year Built
2018
Length
10.1 m (33.1 ft)
Max Span
3 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$513,000
Total Project Cost
$564,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.