POWELL ROAD over OAKLAND SPRING BR

SEC2 T4S R3W · County 083, Alabama · Built 1955 · 2 Lanes · 1,968 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
005187
Year Built
1955
Length
9.8 m (32.2 ft)
Max Span
3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,968
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$306,000
Total Project Cost
$337,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.