DAN TIBBS RD over DRY CREEK

_1.2 Mi W Jct Ala Hwy53 · County 089, Alabama · Built 2020 · 2 Lanes · 1,430 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

34.779025, -86.678431

This bridge is in worse condition than 42% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
021362
Year Built
2020
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,430
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,601,000
Total Project Cost
$1,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.