NICK FITCHARD RD over DRY CREEK
0.8 MI N CO RD 032 · County 089, Alabama · Built 1937 · 2 Lanes · 163 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.783161, -86.669656
This bridge is in worse condition than 60.4% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 89 years old.
Nearby Bridges
Blake Bottom Acc. over Dry Creek
Built 2019
SR 255 over PLUMMER RD
Built 1992
SR 255 over CREEK
Built 1992
BLAKE BOTTOM ROAD over S.R. 255
Built 2019
SR 53 over CREEK
Built 1957
AL 255 over AL 53
Built 2012
DAN TIBBS RD over DRY CREEK
Built 2020
BLAKE BOTTOM ROAD over DRY CREEK
Built 2006
SR 255 over STREAM
Built 1992
AL 255 over STREAM
Built 2005
Bridge Details
- Structure #
- 001605
- Year Built
- 1937
- Length
- 10.7 m (35.1 ft)
- Max Span
- 3 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 163
- Material
- Masonry
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $251,000
- Total Project Cost
- $276,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.