I-59 over SR-6 (US-82)

EXIT 73 · County 125, Alabama · Built 2021 · 6 Lanes · 55,431 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
9
Excellent

Bridge Details

Structure #
021349
Year Built
2021
Length
78.3 m (256.9 ft)
Max Span
76.2 m
Width
39.4 m (129.3 ft)
Lanes
6
Daily Traffic
55,431
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,820,000
Total Project Cost
$8,602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.