SR 167 MP 37.655 over PEA RIVER

3.2 MI N. JCT. 51 · County 031, Alabama · Built 2020 · 2 Lanes · 4,830 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
021297
Year Built
2020
Length
120.4 m (395 ft)
Max Span
42.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,830
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,713,000
Total Project Cost
$4,084,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.