SR 167 MP 37.391 over PEA RIVER RELIEF 1

3.2 MI. N JCT SR 51 · County 031, Alabama · Built 2020 · 2 Lanes · 4,830 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021296
Year Built
2020
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,830
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,743,000
Total Project Cost
$3,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.