I-59/I-20 WB over US 31 City Streets RR

0.4 Miles East of I-65 · County 073, Alabama · Built 2019 · 6 Lanes · 67,732 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021225
Year Built
2019
Length
1977.7 m (6488.5 ft)
Max Span
50.3 m
Width
21.5 m (70.5 ft)
Lanes
6
Daily Traffic
67,732
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$94,929,000
Total Project Cost
$104,422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.