_I20W to 25th StN over _US31 RR 28th StN
_I20 · County 073, Alabama · Built 2019 · 1 Lanes · 15,477 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.529081, -86.805742
This bridge is in worse condition than 23.2% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 7 years old.
Nearby Bridges
25th St ramp I59N over I-20/59 EB/NB
Built 2018
I - 20 WB RAMP over _US31 I20 rmp RR 28thSTN
Built 2019
RAMP""C"" over 26TH STREET
Built 1987
I20E rmp/31st StN over US31 I20 Ramps RA Blvd
Built 2019
12TH AVE NO over FRISCO * SO RR
Built 1913
AL - 3 NORTH over 10 TH AVE NO * RRS
Built 1987
I - 20/59 WEST over 28 TH ST NO
Built 1971
I - 20/59 EAST over 28 TH ST NO
Built 1971
I 59/20 NORTH over 24TH ST BESSEMER
Built 1979
RAMP ""B"" over 26TH ST AND RAMPS
Built 1987
Bridge Details
- Structure #
- 021220
- Year Built
- 2019
- Length
- 461.8 m (1515.1 ft)
- Max Span
- 50.3 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 1
- Daily Traffic
- 15,477
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,549,000
- Total Project Cost
- $9,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.