_I20W to 25th StN over _US31 RR 28th StN

_I20 · County 073, Alabama · Built 2019 · 1 Lanes · 15,477 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021220
Year Built
2019
Length
461.8 m (1515.1 ft)
Max Span
50.3 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
15,477
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,549,000
Total Project Cost
$9,404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.