25th St ramp I59N over I-20/59 EB/NB

.03 Mi W Carraway Bd · County 073, Alabama · Built 2018 · 1 Lanes · 119,947 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
021219
Year Built
2018
Length
632.6 m (2075.5 ft)
Max Span
96 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
119,947
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,712,000
Total Project Cost
$12,883,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.