CR255JOHNMCKINNEY over _RIVER BRANCH

CR255 1 M NE MACEDONIA CH · County 021, Alabama · Built 2017 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021095
Year Built
2017
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$281,000
Total Project Cost
$309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.