CR 32 2MiERefugeCh over CR 32 Walnut Creek

CR 32 · County 021, Alabama · Built 2017 · 2 Lanes · 114 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021086
Year Built
2017
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
114
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$879,000
Total Project Cost
$967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.