CR 8 over ESCATAWPA RIVER RELIEF

DEER PARK · County 129, Alabama · Built 2014 · 2 Lanes · 840 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
020759
Year Built
2014
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
840
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$680,000
Total Project Cost
$748,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.