TURNER DIRT RD over GUM SPRINGS BRANCH

DEER PARK · County 129, Alabama · Built 1983 · 2 Lanes · 15 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
017002
Year Built
1983
Length
11.6 m (38.1 ft)
Max Span
5.8 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
15
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$226,000
Total Project Cost
$249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.