CR 12 over DRY CREEK

1.5 MI EAST AL 25 · County 117, Alabama · Built 2014 · 2 Lanes · 4,182 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020466
Year Built
2014
Length
64.6 m (211.9 ft)
Max Span
20.2 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
4,182
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,851,000
Total Project Cost
$2,036,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.