CO. HWY. 23 over DRY CREEK

1.6 MI. JCT. CO. 16 · County 117, Alabama · Built 2000 · 2 Lanes · 421 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017797
Year Built
2000
Length
14.6 m (47.9 ft)
Max Span
7 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
421
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$441,000
Total Project Cost
$485,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.