TRUCK TRAIL 17 over HOLLINGER CREEK

3.0 M. W. OF CR 64 · County 003, Alabama · Built 2013 · 1 Lanes · 70 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020449
Year Built
2013
Length
61 m (200.1 ft)
Max Span
24.4 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
70
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,468,000
Total Project Cost
$1,615,000