CO. RD. 68 over STYX RIVER

3.7 MI. NE OF I-10 · County 003, Alabama · Built 2011 · 2 Lanes · 493 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
019280
Year Built
2011
Length
103.6 m (339.9 ft)
Max Span
20.7 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
493
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,320,000
Total Project Cost
$2,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.