AL - 4 (US 78) over WOLF CREEK

.6 MI. E OF I20 EDEN EXIT · County 115, Alabama · Built 2014 · 2 Lanes · 7,272 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
020382
Year Built
2014
Length
68 m (223.1 ft)
Max Span
13.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
7,272
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,471,000
Total Project Cost
$2,718,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.