I - 20 over AL - 4 ( US 78)

EDEN EXIT · County 115, Alabama · Built 2005 · 6 Lanes · 53,023 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
019153
Year Built
2005
Length
52 m (170.6 ft)
Max Span
19.5 m
Width
38.1 m (125 ft)
Lanes
6
Daily Traffic
53,023
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,335,000
Total Project Cost
$5,869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.