ELKWOOD SECTION RD over COPELAND CREEK

1.1 MI E JCT FAS RT 45 04 · County 089, Alabama · Built 2010 · 2 Lanes · 1,196 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
020377
Year Built
2010
Length
9.1 m (29.9 ft)
Max Span
4.6 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
1,196
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.