BUTTER * EGG RD over COPELAND CREEK
0.1 S CO RD 214 · County 089, Alabama · Built 1938 · 2 Lanes · 250 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
34.976619, -86.641383
This bridge is in worse condition than 83% of bridges in County 089. The average bridge in Alabama is 0 years old; this one is 88 years old.
Nearby Bridges
ELKWOOD SECTION RD over COPELAND CREEK
Built 2010
ELKWOOD SECTION R over W FORK COPELAND CREEK
Built 1938
ELKWOOD SECTION RD over HUCKLEBERRY CREEK
Built 2005
BOBO SECTION RD over WILL HOLT BRANCH
Built 1936
JOHN HICKS ROAD over HUCKLEBERRY BRANCH
Built 2000
LARKIN SULLIVAN R over COPELAND CREEK
Built 1995
BOBO SECTION RD over COPELAND CREEK
Built 1991
ELKWOOD SECTION R over BRIER FORK FLINT RIVER
Built 1938
ELKWOOD SECTION R over BRIER FORK FLINT RIVER
Built 1940
BOBO SECTION RD. over BRIAR FORK CREEK
Built 2007
Bridge Details
- Structure #
- 001826
- Year Built
- 1938
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3.7 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $249,000
- Total Project Cost
- $274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.