BALDWIN BEACH EXPR over DAVIS BRANCH
0.4 MI. N. OF US 90 · County 003, Alabama · Built 2011 · 2 Lanes · 1,585 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.572594, -87.665803
This bridge is in worse condition than 39% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 15 years old.
Nearby Bridges
BEACH EXPRESS over DAVIS BRANCH
Built 2012
US 90 over BLACKWATER RIVER
Built 1983
BEACH EXPRESS over BLACKWATER RIVER
Built 2014
BEACH EXPRESS over BLACKWATER RIVER
Built 2014
County Road 85 over Davis Branch
Built 2022
Linholm Rd over Elam Creek
Built 2023
WILTERS STREET over ROCK CREEK
Built 2006
BEACH EXPRESS over ROCK CREEK
Built 2014
BEACH EXPRESS over ROCK CREEK
Built 2014
COLLEGE AVENUE over ROCK CREEK
Built 2014
Bridge Details
- Structure #
- 020013
- Year Built
- 2011
- Length
- 109.7 m (359.9 ft)
- Max Span
- 12.2 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,585
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,417,000
- Total Project Cost
- $3,759,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.