US 90 over BLACKWATER RIVER
2.7 MI E OF JCT SR 59 · County 003, Alabama · Built 1983 · 2 Lanes · 6,884 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.565039, -87.672175
This bridge is in worse condition than 44.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 43 years old.
Nearby Bridges
BEACH EXPRESS over BLACKWATER RIVER
Built 2014
BEACH EXPRESS over BLACKWATER RIVER
Built 2014
BEACH EXPRESS over DAVIS BRANCH
Built 2012
BALDWIN BEACH EXPR over DAVIS BRANCH
Built 2011
WILTERS STREET over ROCK CREEK
Built 2006
BEACH EXPRESS over ROCK CREEK
Built 2014
BEACH EXPRESS over ROCK CREEK
Built 2014
COLLEGE AVENUE over ROCK CREEK
Built 2014
County Road 85 over Davis Branch
Built 2022
Linholm Rd over Elam Creek
Built 2023
Bridge Details
- Structure #
- 012989
- Year Built
- 1983
- Length
- 93.3 m (306.1 ft)
- Max Span
- 10.4 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,884
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,244,000
- Total Project Cost
- $3,568,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.