Steel Drive EBL over US 43 NBL * SBL

1 MI S. MOB/WASH CO LINE · County 097, Alabama · Built 2009 · 1 Lanes · 700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
019988
Year Built
2009
Length
88.3 m (289.7 ft)
Max Span
26.5 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,748,000
Total Project Cost
$1,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.