US 43 over PAUL BAYOU RELIEF

0.6 MI. NORTH OF CALVERT · County 129, Alabama · Built 2002 · 2 Lanes · 6,180 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017622
Year Built
2002
Length
37.5 m (123 ft)
Max Span
12.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,180
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,347,000
Total Project Cost
$1,482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.