AL - 53 (US 231) over I-20

231 OVER I-20 · County 115, Alabama · Built 2008 · 6 Lanes · 13,520 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
019743
Year Built
2008
Length
85.3 m (279.9 ft)
Max Span
44.2 m
Width
29.5 m (96.8 ft)
Lanes
6
Daily Traffic
13,520
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,269,000
Total Project Cost
$6,896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.